    EMF Building Development Project

    Building 18 Classrooms to Transform Education in Nsawam Adoagiri, Ghana

    A comprehensive construction initiative by the Empowering Minds Foundation, converting a detailed Bill of Quantities and cost schedule into a modern school that will serve thousands of students for generations.

    18
    Classrooms
    5
    Construction Phases
    32
    Weeks Estimated
    1,000+
    Students to Benefit
    Transparent Reporting
    Every dollar is tracked against the approved Bill of Quantities with regular progress updates.
    Verified Documentation
    Full architectural drawings, cost schedules, and permits available to verified partners on request.
    Community-Led Oversight
    Local stakeholders and EMF staff jointly monitor construction quality and milestones.
    Proven Track Record
    Backed by EMF's history of delivering technology and education programs across Africa.
    Project Overview

    A New School for a Growing Community

    This project delivers a purpose-built 18-classroom school facility to expand access to quality education in Nsawam Adoagiri, Ghana.

    Purpose
    Provide safe, modern classroom space to relieve overcrowding and support long-term educational growth in the community.
    Location
    Nsawam Adoagiri, Ghana — a growing community within the Eastern Region.
    Client
    Empowering Minds Foundation (EMF), in partnership with community stakeholders and donors.
    Community Impact
    Expands enrollment capacity, creates local construction jobs, and strengthens community infrastructure.
    Classrooms
    18 fully finished classrooms with supporting offices and sanitation facilities.
    Overall Objective
    Deliver a durable, code-compliant school building on schedule and within the approved budget.
    Why This Project Matters

    Long-Term Impact Beyond Construction

    Education Impact

    Modern classrooms improve learning conditions and outcomes.

    Community Development

    Strengthens local infrastructure and civic pride.

    Student Capacity

    Adds space for hundreds of additional students annually.

    Economic Benefits

    Creates jobs for local labor, suppliers, and contractors.

    Long-Term Sustainability

    Durable materials and design reduce future maintenance costs.

    Scope of Work

    From Site Preparation to Project Closeout

    Site Preparation
    Land clearing, grading, and setting out the building footprint in accordance with approved architectural drawings.
    Foundations
    Excavation, blinding, and construction of strip and pad foundations sized to soil bearing capacity.
    Structural Works
    Columns, beams, and slabs forming the primary load-bearing frame across all classroom blocks.
    Masonry
    Sandcrete block walling for internal and external partitions, built to specified courses and bonding.
    Reinforcement
    Cutting, bending, and fixing of steel reinforcement bars for footings, columns, beams, and slabs.
    Concrete
    Batching, mixing, casting, and curing of concrete for all structural and non-structural elements.
    Formwork
    Timber and marine board shuttering for columns, beams, and slabs, struck and re-used per schedule.
    Roofing
    Timber trusses, purlins, and roofing sheets installed with fascia, gutters, and rainwater goods.
    External Works
    Pavements, drains, walkways, fencing, and landscaping surrounding the classroom blocks.
    Finishing
    Plastering, screeding, tiling, painting, doors, and windows across all classrooms and offices.
    Utilities
    Electrical wiring, lighting, plumbing, water supply, and sanitation for the completed facility.
    Project Closeout
    Snagging, final inspection, handover documentation, and as-built records for EMF.
    Construction Phases

    Project Timeline

    1
    Phase 1
    4 weeks

    Mobilization & Site Preparation

    Site survey, clearing, temporary structures, and material mobilization.

    Site survey report
    Cleared and graded site
    Temporary site office & stores
    2
    Phase 2
    6 weeks

    Substructure

    Excavation, foundations, and ground floor slab construction.

    Completed foundations
    Damp-proof course
    Ground floor slab
    3
    Phase 3
    10 weeks

    Superstructure

    Columns, beams, block walling, and floor slabs for all classroom blocks.

    Structural frame complete
    Block walling complete
    Upper floor slabs cast
    4
    Phase 4
    8 weeks

    Roofing & Finishes

    Roof installation, plastering, tiling, painting, doors, and windows.

    Roof watertight
    Plastering & painting complete
    Doors & windows installed
    5
    Phase 5
    4 weeks

    Utilities & Handover

    Electrical, plumbing, external works, inspection, and handover to EMF.

    Electrical & plumbing commissioned
    External works complete
    Handover certificate
    Cost Breakdown

    Where the Budget Goes

    A summarized view of the Bill of Quantities, grouped into major construction categories.

    0%6%12%18%24%SubstructureSuperstructureRoofingMasonryFinishesMechanical &ElectricalExternal WorksContingency
    Substructure: 18%Superstructure: 22%Roofing: 12%Masonry: 10%Finishes: 14%Mechanical & Electrical: 11%External Works: 8%Contingency: 5%
    • Substructure
    • Superstructure
    • Roofing
    • Masonry
    • Finishes
    • Mechanical & Electrical
    • External Works
    • Contingency
    Budget Transparency

    How the Cost Schedule Is Organized

    The full cost estimate follows a standard Bill of Quantities format. Expand each category below for a plain-language summary, or request the complete document for a detailed, line-by-line review.

    Materials Used

    Built With Quality Materials

    Concrete

    Purpose: Foundations, columns, beams, and slabs

    Benefit: High compressive strength and durability

    Standard: Class 25 mix, site-tested cubes

    Steel Reinforcement

    Purpose: Tensile reinforcement in concrete elements

    Benefit: Prevents cracking and structural failure

    Standard: Grade 460 deformed bars

    Sandcrete Blocks

    Purpose: Internal and external walling

    Benefit: Cost-effective, locally sourced, good thermal mass

    Standard: 450x225x225mm, min. 2.8N/mm²

    Timber

    Purpose: Roof trusses, formwork, and doors

    Benefit: Lightweight, workable, readily available

    Standard: Kiln-dried structural grade

    Marine Board

    Purpose: Formwork for concrete casting

    Benefit: Smooth finish, reusable across pours

    Standard: Waterproof grade plywood

    Cement

    Purpose: Binding agent for concrete and mortar

    Benefit: Consistent strength development

    Standard: Portland cement, certified supplier

    Sand

    Purpose: Concrete and mortar mixing

    Benefit: Workability and finish quality

    Standard: Washed, sharp sand, free of silt

    Stone / Aggregate

    Purpose: Concrete aggregate

    Benefit: Structural bulk and strength

    Standard: 19mm and 12.5mm graded chippings

    Laterite

    Purpose: Filling and compaction

    Benefit: Stable sub-base for slabs and pavements

    Standard: Compacted to 95% max dry density

    Binding Wire

    Purpose: Securing reinforcement cages

    Benefit: Maintains rebar spacing and cover

    Standard: Galvanized 1.6mm wire

    Nails & Fasteners

    Purpose: Formwork and timber assembly

    Benefit: Secure, temporary structural connections

    Standard: Standard construction grade

    Waterproofing

    Purpose: Foundations, roofs, and wet areas

    Benefit: Prevents moisture ingress and rot

    Standard: Bituminous / membrane systems

    Roof Materials

    Purpose: Trusses, purlins, and sheeting

    Benefit: Weatherproof, long-lasting cover

    Standard: Gauge 28 aluzinc roofing sheets

    Doors

    Purpose: Classroom and office entrances

    Benefit: Security and durability

    Standard: Solid-core timber / steel-framed

    Windows

    Purpose: Natural lighting and ventilation

    Benefit: Energy-efficient daylighting

    Standard: Aluminum-framed louvre windows

    Electrical

    Purpose: Wiring, lighting, and power outlets

    Benefit: Safe, code-compliant power distribution

    Standard: IEC-compliant cabling & fittings

    Plumbing

    Purpose: Water supply and sanitation

    Benefit: Reliable water access and hygiene

    Standard: PVC/PPR piping, certified fittings

    Construction Process

    Step-by-Step Workflow

    Planning
    Surveying
    Excavation
    Foundation
    Columns
    Ground Floor
    First Floor
    Roof
    Finishes
    Inspection
    Completion
    Project Deliverables

    What EMF Receives

    Fully completed 18-classroom school building
    Structural frame, foundations, and roofing
    Complete finishes: plastering, tiling, and painting
    Doors, windows, and fixtures installed
    Electrical and plumbing systems commissioned
    External works: pavements, drainage, and fencing
    Quality assurance and materials testing records
    Final inspection report and handover certificate
    Sponsorship Tiers

    Choose Your Level of Impact

    Every contribution moves this project closer to completion. Select a sponsorship tier below or contact us to design a custom giving plan.

    Community Partner
    $1,000+

    Sponsor classroom furnishings and learning materials for a single classroom.

    Classroom Sponsor
    $10,000+

    Fund the complete construction of one classroom, with your name or organization recognized on-site.

    Phase Sponsor
    $50,000+

    Underwrite an entire construction phase and receive regular progress reporting and site visit access.

    Founding Partner
    $100,000+

    Lead investor status with naming rights consideration, VIP groundbreaking invitation, and ongoing impact reports.

    FAQ

    Frequently Asked Questions

    Get Involved

    Join Us in Building the Future

    Whether you're an investor, donor, government agency, or contractor — there's a way to get involved.

    Partner With EMF

    Sponsor a Classroom

    Request Documents

    Donate Now

    Contact Project Team

    Every Classroom Counts

    Help Us Open the Doors to 1,000+ Students

    Your support — as a donor, sponsor, partner, or contractor — turns this Bill of Quantities into a finished school. Take the next step today.